• Home
  • ABOUT
  • API SEALS
  • PRODUCTS
    • APC
    • API RED
    • DMSI
  • CONTACT US
  • MEMBERS AREA
    • Login

First API Team Project with PSPC: Supply and Installation of Engineered Clamp for E302 Cover Flange

  • By admin
  • TMG ,
  • Comments are off


 


This photo is taken after safely successfully completed On-line Leak Sealing & Installation of Engineering Design Clamp for E-302 HOT OIL HEATER.
Prior to the Completion of Job – PSPC Looking for the right company to provide engineering solutions. Scope of Job is enclosure the E-302 Heat Exchanger Leakage of Hydrogen Sour Gas with 380 Operating Temperature @ 380 Degree Celsius & Operating Pressure @ 60 Bar.

PSPC approach TEAM Singapore for Engineering Design Calculation Solutions, As American Packing Industries as a local representative in the Philippines our Principal informing us to conduct a preliminary Technical meeting and conduct site measurement. API-TEAM Personnel Headed by Division Technical Manager Joel Carrosino & Supervisor Carlos Evangelista had a meeting discussion and taken all site measurement pertaining for the dimension to provide engineering support.

TEAM Singapore Eric Schmitz Director Technical & Ye Win Htut Sr. Mechanical Engineer provided the Engineering Design and Calculation for the Clamp with Strong backing design and right sealant for Hydrogen Sour Gas leaks. API – TEAM took 3 days to complete, assemble and Installation of the approximate 3 Tons weight of Clamp at Site.
This Project is Combine International and Local Expertise to provide an Onsite Mechanical Solutions On-Line Leak Sealing across entire Philippines Region.

ARCHIVE ARTICLES

  • ANNUAL SALES MANAGERS MEETING 2020
  • API HEAD OFFICE CELEBRATES CHRISTMAS WITH A BANG
  • API Christmas Party 2019
  • Upcoming Holiday this August
  • PSME 6th Visayas Regional Conference
  • First API Team Project with PSPC: Supply and Installation of Engineered Clamp for E302 Cover Flange
  • APC Product Presentation (Davao Visit)
  • Company Outing 2018
  • Business Tools For Quality Improvement Training
  • APC Product Presentation and Technical Discussion
  • Head Office Christmas Party 2017
  • Mission – Vision Statement Installation
  • 24th PICS Annual Convention July 13-14,2017
  • Head Office Summer Outing 2017
  • Annual Conference Meeting Jan 12-14, 2017 @Panglao Bohol
  • Head Office Christmas Party 2016
  • API Apps
Footer Elements

Search


Testimonials

  • "Curabitur quis nisl in leo euismod venenatis eu in diam. Etiam auctor diam pellentesque lectus vehic

    Steve

    www.company.com
  • "Curabitur quis nisl in leo euismod venenatis eu in diam. Etiam auctor diam pellentesque lectus vehic

    Alan Steven

August 2026
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
31  
« Dec    

API Product Lines

hands2

CURRENT ARTICLES

  • ANNUAL SALES MANAGERS MEETING 2020
  • API HEAD OFFICE CELEBRATES CHRISTMAS WITH A BANG
  • API Christmas Party 2019

Announcement

* To all the winners of Most Visited Award you may claim your reward starting today and look for Ms. Jonalyn Santos
   Scan QR Code with your Smart Phone to Find Us on the   Web!   

Videos

APC Project

  • #2593 (no title)
  • About
    • Company Profile
    • Mission and Vision
  • ABOUT APC
  • afstools
  • apctools
  • API RED
  • API SEALS
  • ARP SAMPLE
  • Blog
  • bluebox
  • Career
  • Contact
  • Contact Us
  • DMSI
  • DMSI TOOLS
  • Employees
  • Home
  • Login
  • Logout
  • On-site Installation
  • Our Blog
  • PHE TOOLS
  • PRODUCTS
  • PROPOSAL about us
  • Tools
  • TOOLS
  • #2702 (no title)
  • RECEIVING OF INCOMING ITEM
  • Your Account

© 2017 American Packing Industries (Phils) Corp